24/7 Phone Services 0783 719 2665
info@gplanetcltd.com Kemp House 128 City Road, London EC1V 2NX

Coca-Cola Plant & Factory Extension Sidcup

To project site manage and oversee the refurbishment of the alterations and extensions to the existing Canning Production Facility and Raw Materials Process Building at Cray Road Sidcup. All works to involve the demolition of existing structures where required, the design and construction of new extensions to two separate plants of the manufacturing plant.

Before

After